top of page
VMF & COF
Fort Riley | KS
Design/Assist, LEED Silver construction of 9 buildings: 3 Company Operations Facility (COF) buildings (Building 770, 820 and 820A), 3 Vehicle Maintenance Facility (VMF) buildings and 3 storage buildings. HVAC design included radiant floor heating systems for VMF buildings; boilers, pumps and AHU’s with heat recovery
bottom of page